Executive Summary Report – December 2, 2014

What’s New? The exterior windows have been installed, all openings have been sealed, and the heat is up and running in Alexia Hall! The Past Week (Alexia Hall) • Elevator installation is complete. • Drywall work continues. • Concrete floor polishing on the ground level has started. • Painting has begun on the ground level. • ...